Residential drafting / Brisbane and Gold Coast
Council-ready drawings for renovations, extensions and additions
- Extensions
- Storey additions
- Decks and patios
- Carports and garages
- Granny flats
- Internal alterations
We tell you which approval pathway applies before you spend anything, then produce the set your council can assess and your builder can price. You get a fixed price in writing before we start, a Client Portal to follow progress, and the files as PDF plus editable DWG.
- Fixed price before we start
- We know what your council asks for
- PDF and editable DWG

The problem
The renovation is planned. The approval process is the part nobody explains.
Most people renovating a home have never dealt with council approval before, and it shows in the questions we get every week. Does an extension need a Development Application or a building approval? Why is the answer different one suburb over? What does the certifier actually need to see?
Meanwhile the builders you want to price the job are asking for drawings before they will commit to a number, and quoting from a rough sketch gets you rough prices. The project is real, the budget is real, and the whole thing is idling because the documentation does not exist yet.
What you want is simpler than an hourly-rate scope that reads like it was written to grow: the right drawings, at a price somebody commits to upfront.
The approval pathway
Depends on your council, your zone and the work itself. Gold Coast is not Brisbane, and a DA is not a building approval. We tell you which one applies before we draw.
Your builder
Tenders properly only when the drawings pin the scope down. One documented set means the quotes you get actually compare.
Your existing house
Only needs measuring when the original plans are not available, or when earlier alterations are not shown on the plans you have. Where it does, the measure is in your quote from the start.
You
Get a fixed price before you spend anything, then follow the project in your Client Portal without chasing anyone for updates.
Tell us what you are planning and we will tell you the pathway.
How we work
From first chat to final sign off, without the runaround
01
We tell you the pathway first
Which approval applies, what your council will ask for, and what the drawings need to cover. You get that in the first conversation, before any money changes hands.
02
Drawn to be assessed
We have been producing council-ready drawings in Queensland since 2016, and every set is built around what your council and certifier assess. If they ask for corrections to our documentation during assessment, we make them at no additional cost.
03
We stay in it until sign off
Certifier queries come to us and we answer them. We liaise with your surveyor, engineer and builder at no additional cost, so you are not the messenger between technical parties.
Do you need your house measured? Only when the original plans are not available, or when you tell us about earlier alterations that are not shown on them. Where that applies, the measure is included in your quote from the start, so the new work is drawn against the house as it stands.
We will tell you exactly what you need in the first conversation.
Who this is for
The renovations, extensions and additions we draw every week
If the work changes the house or puts a new structure on the site, it needs drawings. These are the projects that come through our door most.
Whichever it is, the first conversation tells you the pathway.
What you receive
The full set, from concept to construction
01
Preliminary drawings
The renovation drawn to your brief and refined with you before anything is documented, so you can see the plan before you commit to it.
02
Council approval documentation
The documentation your approval pathway requires: site plan, floor plans, elevations and sections, drawn against your existing house.
03
Construction drawings
Additional drawings focused on the construction stage, which your builder tenders from and your trades build from, dimensioned and complete.
04
Coordination
We liaise with all required consultants at no additional cost as part of our services.
Working drawings that go past approval. We deliver in two stages, preliminary drawings and then working drawings. Our working drawings combine the council approval documentation with a more complete construction set. Some quotes come in lower because they cover only what approval needs, and when the construction information is thin, the builder has to chase extra detail during the build or price in the uncertainty. A fuller set up front helps you avoid both.
You get the editable DWG as standard. Your engineer or your certifier can work straight in the file. Most firms will not give you that.
Scoped to your renovation and your council.
How it runs
Three steps between the idea and the builder starting
Tell us what you are planning
The address, what you want to change, and anything you have: sketches, photos, old plans, a survey. We come back with the approval pathway and a fixed quote in writing.
We measure, design and document
Where the existing plans are missing or out of date, we measure the house first. Then we refine the design with you, with three complimentary revisions along the way, and draw the full approval and construction set. You see the design before it is finalised.
Drawings delivered, approval in motion
The set arrives as PDF and DWG, ready for lodgement and builder tender, and you can follow the project timeline in your Client Portal along the way. Certifier queries come to us and we handle them at no additional cost.
Takes about two minutes. No obligation.
Why people trust us with it
The process is the thing people write reviews about
"I expressed that we would need someone to hold our hand to help navigate the process. From the initial consultation through to the finished product, nothing was ever to much trouble for Luiz."
"Luiz helped us stay with in our budget and liaised directly with the surveyor, builder and council... You really did make this process stress free."
"I found the cost to be incredibly reasonable in comparison to other quotes I received too."
Tell us what you are planning and we will tell you what it needs.
Before you ask
The questions we get every week
Do I need council approval for my renovation?
What is the difference between a renovation, an extension and an addition?
Do you draw decks, carports, patios and pergolas on their own?
My house has no existing plans. Is that a problem?
Can I see the design before it is finalised?
How long does it take?
What will it cost?
Can you work with my builder and engineer?
Bring the rest of your questions to the first conversation.
Get started
Tell us the plan. We will tell you the pathway.
Not sure whether the idea needs a DA, a building approval or neither? That is the first thing we work out, and it costs you nothing. Send us the address and what you are thinking, and we come back with the pathway and a fixed quote.
Prefer to talk it through? Call 1300 156 669 or 0468 102 375, or email info@xpressdraft.com.au.
Fixed price. Quoted before we start, and it does not change unless the scope does.
Client Portal. Follow your project timeline online, without chasing us for updates.
A straight answer. If the project is not ready to proceed, we will tell you before you spend money on drawings.
QBCC 1131941. Licensed, insured and Queensland based.
We reply within one business day. Your details are used to quote your job and nothing else.